Connections



When setting to work the SmartSPR, make all of the connections to battery -ve first.  Next, make the connection from SmartSPR to pressure switch (white).  Then, make the connection from the pump -ve to SmartSPR Pump- (blue).  Lastly, connect the pump, SmartSPR Batt+ (red) and solar charge controller +ve to battery positive.

No comments:

Post a Comment